This Design and Build project involved the demolition of an existing pavilion. Our role was to create a new pavilion in the same position, which included washrooms, toilets, changing rooms a medical room and office. On the top floor, a club house and kitchen were installed for guests. The grandstand located in front of the pavilion incorporated the steel columns which were the listed part of the old structure. Timber frames were used for the roofing to create the slanted effect. Car parking was also created for guests, which involved groundworks.